SEPTEMBER 1, 2016

141-143 Shoreditch High Street, London.

Project Summary:

Location: London
Sector: Office
Value: £32K
Duration: 5 Months
Main Contractor: Complete Services Kent Ltd
M&E : Michael Popper Associates LLP
Client: The Estate Office Shoreditch
Architect: Patalab Architecture

This exciting modern office space is the result of a high-quality office refurbishment. The design brief was to create a street presence and a new identity for the building, much in keeping with the creative character of the area.

Our team has been involved in several high-quality projects in this trendy part of the city. The recent addition to our ‘Shoreditch project gallery’, is 141-143 Shoreditch High Street development.

Shoreditch High Street is home to many vibrant and creative work hubs. The spirit of the area reflects on the rich history of clothing, furniture, and printing. 

Office lighting for a CAT A refurbishment at 141-143 Shoreditch High Street, London.
Office lighting for a CAT A refurbishment at 141-143 Shoreditch High Street, London.

THE DESIGN PROCESS.

We worked alongside Patalab Architecture to supply office lighting for a Cat A refurbishment of this unique 4 storey building. Our team was involved in the design process from the initial stages all the way to completion. A lighting scheme and calculations were produced to support the architect and samples of the luminaires were provided to the design team to be signed off.

THE DESIGN BRIEF.

The design brief for Shoreditch High Street was to create a street presence and a new identity for the refurbished building. This has been achieved by the distinct design of the main staircase and exposed atrium, a highly creative design, much in keeping with the trendy Shoreditch area.

The new office space was calling out for modern LED office lighting, in line with the high standard of the refurbishment project.

Office lighting for a CAT A refurbishment at 141-143 Shoreditch High Street, London.
Office lighting for a CAT A refurbishment at 141-143 Shoreditch High Street, London.
Office lighting for a CAT A refurbishment at 141-143 Shoreditch High Street, London.
Office lighting for a CAT A refurbishment at 141-143 Shoreditch High Street, London.

The Leam Suspended LED was specified for the main office lighting and used on all floors. The office floors benefit from high ceilings and plenty of daylight. The modern design of the Leam LED contributes to the ‘raw’ stripped-back look of the interior featuring the exposed bricks and visible services.

With its increased efficiency it represents a new generation for modern office luminaires and mimics the T5’s ability to distribute light direct/-indirect from a single source. Leam can be used as a standalone luminaire or as part of an interconnected linear lighting system.

Project in figures:

4 Floors

We supplied office lighting for this unique 4 storey building

5 Months

From initial project brief through to delivery.

Need assistance with bringing light back into an old building?

Get in touch for a personal quotation for your office lighting.

Need assistance with bringing light back into an old building?

Get in touch for a personal quotation for your office lighting.