In September 2017, the 299 team were approached by the project team at Cundal, who acted as the consultant on the project, with the request for detailed lighting design. We worked closely with the M&E contractor at Synergy MEP and our lighting design and engineering team became an integral part of the project, turning the design concept into reality.
Our light engineers attended site meetings with the design team, provided product samples and technical expertise for the project.